The Connecticut Department of Transportation is developing plans to upgrade existing pedestrian crossing equipment (to include countdown pedestrian indications, accessible pedestrian push buttons, and concurrent pedestrian phasing) in an effort to improve accessibility and pedestrian safety at 61 locations, including a series within the municipalities of Fairfield,  Weston, and Westport.

The following intersections are included in State Project No.  0173-0521: 

Traffic Control Signals: 

  • Fairfield – U.S. Route 1 (Post Rd.) at Unquowa Rd., Old Post Rd., & Unquowa Pl. – Int. # 050-212
  • Fairfield – U.S. Route 1 (Kings Highway East) at Chambers St. and Private Dr. – Int. # 050-218
  • Fairfield – Route 58 (Tunxis Hill Cut Off) at Old Stratfield Rd. #2 and Tunxis Hill Rd. #2 – Int. # 050-223
  • Fairfield – Route 58 (Black Rock Tpke.) at Burroughs Rd. – Int. # 050-226
  • Fairfield – Route 58 (Black Rock Tpke.) at Brookside Dr. – Int. # 050-227
  • Fairfield – Route 58 (Tunxis Hill Cut Off) at Drives to Kohl’s and Stop & Shop – Int. # 050-240
  • Fairfield – Route 58 at Katona Dr. and Katona Dr. Ext. – Int. # 050-244
  • Fairfield – Route 58 (Black Rock Tpke.) at Fairfield Woods Rd. and Fairfield Woods Shopping Ctr. – Int. # 050-258
  • Fairfield – Route 58 (Black Rock Tpke.) at Tahmore Dr. and Old Black Rock Tpke. – Int. # 050-263
  • Weston – Route 57 (Weston Rd.) at Broad St. and Good Hill Rd. – Int. # 157-201
  • Westport – Route 33 (Saugatuck Ave.) at I-95 Southbound Ramps – Int. # 158-201
  • Westport – U.S. Route 1 (Post Rd. East) at Playhouse Sq. Shopping Ctr. Dr. – Int. # 158-203
  • Westport – U.S. Route 1 (Post Rd. West) at Sylvan Rd. – Int. # 158-209
  • Westport – U.S. Route 1 (Post Rd. West) & U.S. Route 1 (Post Rd. East) at Route 33 (Riverside Ave. & Wilton Rd.) – Int. # 158-211
  • Westport – U.S. Route 1 (Post Rd. East) at North Turkey Hill Rd. & South Turkey Hill Rd. – Int. # 158-220
  • Westport – SSR 476 (Sherwood Island Connector) at Greens Farms Rd. – Int. # 158-226
  • Westport – U.S. Route 1 (Post Rd. East) at S.R. 476 (Sherwood Island Connector) – Int. # 158-229
  • Westport – Route 33 (Wilton Rd.) at Merritt Parkway Connector and Spring Hill Rd. – Int. # 158-247

 

It is the Department’s policy to keep the public informed and involved when such projects are undertaken.

It is important that the community share its concerns with us to assist in the project’s development.

At this time, it is anticipated that an informational meeting or formal public hearing will not be necessary.   

The Design Plans for this project are expected to be completed in February 2023, with a tentative advertising date for construction of April, 2023

Anyone interested in requesting information on this project may do so by contacting Ethan Donecker, Project Manager via email at Ethan.Donecker@ct.gov.  (Please make reference to Project No. 0173-0521. )

 